Everything About ___
Live briefing

Everything about Critical path method

Method of scheduling activities

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish. It is commonly used in conjunction with the program evaluation and review technique (PERT). Wikipedia →

🧭 Start here: a 6-step reading path

  1. Read the overview: Critical path methodA 5-minute orientation
  2. Skim a recent paper: Path-factor critical covered graphs and path-factor uniform graphsInfluential work since 2022
  3. Pick up a classic book: Latent variable modelsThe most-reprinted book on the subject
  4. Read the landmark paper: Fuzzy critical path methodCited 91 times
  5. Go sideways: Program evaluation and review techniqueA closely related topic
  6. Go sideways: Critical path dragA closely related topic

📖 Definitions

Noun The sequence of dependent steps that determine the minimum time needed to carry out an operation.

🗂️ The subject at a glance

  1. History
  2. Basic techniques
  3. Usage
  4. In popular culture

🏆 Landmark papers (most cited)

🆕 Influential since 2022

📚 Books worth reading

Ranked by number of editions on Open Library, a rough measure of how lasting a book is.

🔗 Related topics